Project Scoping with Process Assumptions

Project Scoping with Process Assumptions

One of the biggest risks to project budget and schedule is changes to the project scope. During the initial phases of a project there is often limited resource data available. Many assumptions need to be made to come up with a process design for regulatory applications, initial cost estimates and project schedules. The more accurate […]

0 READ MORE
Lump Sum Billing

Lump Sum Billing

Scovan Engineering offers lump sum engineering fees on our projects.  The fee is based on the scope of work for a project and is calculated as a percentage of the estimated total installed cost.  The benefits for our clients by offering lump sum pricing are: Confidence in the engineering costs from the project initiation stage […]

1 READ MORE
A Look At Lindbergh

A Look At Lindbergh

Engineered by Scovan, on behalf of the Pengrowth Energy Corporation, The Lindbergh Project is a 12,500 barrel per day greenfield Steam Assisted Gravity Drainage (SAGD) development located 75 km south of Cold Lake, Alberta. Pengrowth contracted Scovan to engineer this commercial SAGD facility after successful commissioning of a Lindbergh pilot facility, also engineered by Scovan, […]

0 READ MORE
Modular Solutions

Modular Solutions

Field construction poses a significant risk of project cost and schedule overruns. Modularization reduces the scope of the work completed during field construction, resulting in reduced cost and risk. Modularization involves breaking the facility into shippable-sized modules. These modules are constructed in shops under controlled conditions, close to a larger supply of labour, where productivity […]