Past Work – Case Studies
NWR
Module Assembly of Pipe and Structural, E&I and Insulation of 48 Modules.
DESCRIPTION:
Gemini was awarded 48 modules to erect structural steel for, install piping on, complete final tie-in’s, NDE, and pressure testing on, as well as trace and insulate. Along with this work, Gemini was tasked with 18 Vessels to repair/rework do to fabrication error made by an overseas provider, added to our scope midway through the project. Gemini condensed the project schedule by 4 months and had a peak man power of 550 people between assorted craft.
SCOPE:
Fourty-eight (48) Modules, Structural Assembly, Pipe Assembly, E&I, Insulation. Included modifications to supplied Equipment (vessels), tie-in welding, structural and pipe fabrication as required.
STATS:
- 48 modules
- On time
- On budget
- Resulted in repeat work
- $20-million-dollar project