Wellpads 5-8 wellpairs & CPF Facilities

DESCRIPTION: 

Gemini’s relationship with Husky is based on collaboration and accountability and a joint effort to have the highest quality and most cost effective program possible. We worked as the sole sourced fabricator to deliver a program under budget with reduced timelines than expectations. 

SCOPE:

Wellpad: Fabrication, Assembly, E&I and Insulation of Up to 18 Modules and 1 ship loose piping package

CPF: Fabrication, Assembly, E&I and Insulation of 15 Modules and 13 ship loose piping packages

STATS:

  • Project Start: 2015 – Present
  • Project Completion: 13 Wellpad facility projects & 4 CPF Projects
  • Duration: Wellpad – 3.5 Months  |  CPF – 8 Months
  • Safety @ Completion: 0 TRIF/0 LTI
  • Total FDI: Wellpad:  6860.5 FDI per Wellpad  |  CPF: 39,752 FDI per CPF
  • Total Assembly: Wellpad: 3050 LM Pipe installed x 13  |  CPF: 3450 LM Pipe Installed x 4 + Ship loose spools hydrotested
  • Total Cable Tray: Wellpad: 584 LM  |  CPF: 1242 LM
  • Total Cable Pulled: Wellpad: 4235 LM  |  CPF: 2045 LM
  • Total EHT & Glycol trace Installed: Wellpad: 1627 LM  |  CPF: 4185 LM
  • Total Insulation: Wellpad: 3183LM (+ 756 Soft Covers)  |  CPF: 2249 LM (+ 415 Soft Covers)
  • Base Load of Module yard – Program to complete 4 Wellpads per year and 1 CPF Facility

Central Processing Facilities:

Well Pads: