Past Work – Case Studies
Husky Energy
Wellpads 5-8 wellpairs & CPF Facilities
DESCRIPTION:
Gemini’s relationship with Husky is based on collaboration and accountability and a joint effort to have the highest quality and most cost effective program possible. We worked as the sole sourced fabricator to deliver a program under budget with reduced timelines than expectations.
SCOPE:
Wellpad: Fabrication, Assembly, E&I and Insulation of Up to 18 Modules and 1 ship loose piping package
CPF: Fabrication, Assembly, E&I and Insulation of 15 Modules and 13 ship loose piping packages
STATS:
- Project Start: 2015 – Present
- Project Completion: 13 Wellpad facility projects & 4 CPF Projects
- Duration: Wellpad – 3.5 Months | CPF – 8 Months
- Safety @ Completion: 0 TRIF/0 LTI
- Total FDI: Wellpad: 6860.5 FDI per Wellpad | CPF: 39,752 FDI per CPF
- Total Assembly: Wellpad: 3050 LM Pipe installed x 13 | CPF: 3450 LM Pipe Installed x 4 + Ship loose spools hydrotested
- Total Cable Tray: Wellpad: 584 LM | CPF: 1242 LM
- Total Cable Pulled: Wellpad: 4235 LM | CPF: 2045 LM
- Total EHT & Glycol trace Installed: Wellpad: 1627 LM | CPF: 4185 LM
- Total Insulation: Wellpad: 3183LM (+ 756 Soft Covers) | CPF: 2249 LM (+ 415 Soft Covers)
- Base Load of Module yard – Program to complete 4 Wellpads per year and 1 CPF Facility